Raised and split-level decking with steps
Supplied and fitted raised or split-level decking in Ireland costs €260–€420/m² including deeper concrete pad foundations, structural bearers, diagonal bracing, steps and guarding where drops exceed 600 mm.
Turning sloping Irish gardens into level dining terraces with engineered footings, steps and compliant balustrades.
Free, no obligation. One local builder prices it, not five.
- €260–€420/m²raised or split-level, fitted
- 600 mmdrop triggering Part K balustrade
- 1,100 mmminimum external guard height
- 300 mmheight checked for overlooking

Why raised decks cost more than ground-level builds
Once a deck lifts more than 400 mm off the garden, it stops behaving like ground paving and acts like a raised outdoor floor carrying dynamic loads from groups of people and heavy furniture. Structural posts, double-bolted rim beams, diagonal sway bracing and deeper concrete pads replace simple ground-hugging joists.
Stepped / split-level terrace
€260–€420/m²
Breaks a steep garden into two lower zones, reducing drop height and avoiding fortress-like perimeter railings.
High raised dining platform
€300 to €420/m²
Built level with upper back patio doors over a deep garden fall, with full 1,100 mm timber or glass guarding.
Under-deck storage skirt
Quoted per linear m
Slatted ventilated fascia doors turning high under-deck space into dry mower and bike storage.
Price my deck
Four quick taps show what your deck costs in Ireland before we ask for a phone number. One local builder calls, not five.
A raised or split-level deck, 13 to 24 m², on sloped or raised ground: €5,000 to €8,600, supplied and fitted.
How this deck guide price is calculated
Figures reflect going Irish supply-and-fit rates for that board class, footprint in square metres and ground preparation. Standard figures include Use Class 4 C24 pressure-treated joists, joist tape, stainless or hidden fixings, weed membrane and installation on accessible sites. Sloped gardens, deep concrete pads, aluminium sub-frames, glass balustrades and old deck disposal move the total. Ask your builder whether the written price carries 13.5% or 23% VAT under Revenue rules. Treat this figure as a planning guide before a site measure.
Structural and legal checks on raised Irish decks
- Poured concrete pads beneath every post. Excave past soft topsoil to firm subsoil and mount structural 100 × 100 mm or 150 × 150 mm posts on galvanised steel shoes above the pad so end grain stays dry.
- Bolted bearers, never nailed-only joints. Primary beams must sit notched into posts or rest on heavy structural hangers with M12 galvanised or stainless coach bolts.
- Part K balustrade above 600 mm. Any edge dropping over 600 mm requires a 1,100 mm guard with gaps under 100 mm and non-climbable infill.
- Check overlooking over 300 mm. Before building near a side fence, check sightlines into neighbouring windows and gardens; see planning and overlooking rules.
Related decking guides
Balustrades & Part K600 mm drop trigger, 1,100 mm exterior guard height, 100 mm sphere gap and steps.
Planning & overlookingClass 6 1 m level limit, raised decks over 300 mm, privacy screens and Section 5.
Pads & pedestalsPoured concrete pads and adjustable pedestals over slabs versus dug timber posts.
Sub-frames for wet gardensWhy cheap UC2/UC3 joists fail in Ireland, UC4 C24 timber, joist tape and metal frames.
Decking costs per m²Full Irish supply-and-fit breakdown by board type, area, extras and VAT.
Covered decks & pergolasCombining timber or composite decks with pergolas, canopies and glass screens.Questions Irish homeowners ask before building a deck
How much does raised decking cost per m² in Ireland?
Raised and split-level decks typically run €260–€420/m² fitted, depending on drop height, step runs and whether timber or glass balustrades are fitted.
Can I avoid balustrades by stepping my deck down?
Yes. Splitting a 900 mm slope into two tiers each under 600 mm high often removes the legal trigger for a 1,100 mm guard rail while making the garden feel more open.
Do raised decks need planning permission?
Rear decks stay exempt under Class 6 up to a 1 m ground-level change, though raised decks above 300 mm close to a boundary fence can attract overlooking complaints. A €80 Section 5 council check confirms your exact plot.
How long does a raised deck take to build?
Allow 1 to 2 weeks on site for concrete pad curing, heavy framing, steps and balustrade alignment.
Browse every decking guide and county page
Deck builds & costs
Irish specs & rules

Check your deck price before booking a site visit
Choose the board material, footprint in m² and ground condition. When you want a measured quote, your outline goes to a single deck builder in your county.
